20+ Years Know-how Manufacturer
NanTong Port , Lusi port area
LNG Distribution and Transfer Station Project
The first phase of Guanghui energy LNG distribution and transfer station in lvsigang District of Nantong Port plans to build two 50000m3 double metal single containment LNG storage tanks with annual turnover capacity of 600,000 tons, which are under construction and are expected to be put into operation in 2016. LNG products are filled by loading arm, transported by low-temperature tank truck, compressed by bog, transported or re liquefied back to the storage tank.
The Products We Huachang Supplied:
Seamless & Welded Stainless Steel Pipes
TP304 TP304L
Φ21.3~813mm WT 2.77~11mm
Qty:2435tons